POL FACILITIES

Homepage Scope of Business

VARIOUS MODIFICATION WORKS OF POL FACILITIES

Replacement of Wire Fences at 2 POL Facilities, Concrete Coating around three High-pressure Pumping Stations, Replacement of Scraper Roofs of Eastern Anatolia POL Facilities, Construction of Access Roads to Storage Tanks in three Tank Farms, Replacement of Tanker and Railway Car Filling Arms, Construction of three Valve Pits and in Connection with Damages suffered by Western Anatolia Pipelines in 1996 and 1997 16,630 m³ of Excavation, 15,846 m³ Stabilizing Filling, 14,238 m² of Concrete Coating, 1,892 m³ of Concrete of Various Dosages, 2,104 m² Concrete Formwork, 9,512 tons of Concrete Steel, 1,365 kg of Steel Works, Replacement of 1,885 m Wire Fence, 22,951 kg Roof Girder, 2,027 m² Trapezoidal Aluminum Roof Covering, Preparation of 2,718 m Pipeline Route, 2,718 m Pipeline, 612 m Creek Crossing, 2,648 m of Stone Filling, 79 Pipeline Marking Stone, 153 m Road Crossing, Placement of 180 m of Pipe within Concrete Envelope, 36 Cathodic Protection, Pipeline Gabion Filling at 7 Points, PN100 DN200 330 m, PN100 DN150 1250 m, PN100 D100 825 m Liquid Fuel Pipeline, PN100 DN150 three Slide Valves, two 100 kVA Diesel Generator Sets, 66 Truck and 33 Railway Car Filling Arm Supply, Installation and Construction Works.

30.07.1997 - 12.02.1999

CONSTRUCTION OF INFRASTRUCTURAL FACILITIES AT ERZURUM AND BATMAN AIRPORTS

ERZURUM AIRFIELD: 2x2,500 m³ Aircraft Fuel Storage Tank, 1x1,250 m³ Storage Tank, Misc. Works of New POL Facility.

ARIFIYE TANK FARM: Asphalt Road: 3,407 m², Concrete Platform: 4,522 m², Site Lighting, New Manifold Station, Scraper Station, Pump Pit, 10 m³ Drainage Tank, 100 m³ Mixture Tank, Emergency Connection Pit, Restoration of Storage Tanks.

28.07.1999 - 01.07.2002

SUPPLY AND INSTALLATION OF PUMP-ENGINE SETS AT İZMİT-ESKİŞEHİR LIQUID FUEL PIPELINE PUMP STATIONS

Supply and Installation of six Diesel Engines, Supply and Installation of 13 High Pressure Pumps, Supply and Installation of 13 Gearboxes, Supply and Installation of 13 Impermeable (gas-proof) Steel Wars, Supply and Installation of four High-pressure Pumping Station Control Systems, Supply and Installation of four High Pressure Pumping Station Control Systems, Supply and Installation of two Temperature Control Water Regulator Valves, Supply and Installation of 18 DN150 PN 100 and four DN200 PN 100 Spherical Valve, Welded Collar Flanges and Flange Gaskets.

CONSTRUCTION OF MANIFOLD STATION, COATING TANK FLOOR WITH EPOXY AND SUNDRY WORKS

Restoration of 5,000 m³ Tank (Replacement of 239 m² Floor Sheet Steel, 980 m² Epoxy Coating, 951 m² Epoxy Coating), Coating of Concrete with Epoxy (295 m³), Installation of Fuel-water Filter, Supply and Installation of seven 100 KVA and two 150 KVA Diesel Generator Sets at Various Facilities, Modifications to High Pressure Pump Engine Set.

05.09.2000 - 18.01.2002

Big and Strong Jobs.

Maktel Construction and Trade Co. with its 47 years of experience, financial strength and remarkable past performance has undertaken numerous diverse contracs and become one of the Turkey's leader constractor firm in the field of general and military contracting with various types of construction projects.

+90 212 287 53 23 or Write Us